Precautions for operation of single beam crane

2022-4-6 14:10:30
一键分享:

The single beam crane should be operated according to the operating procedures in the operation process to avoid affecting the use of equipment due to misoperation. Below, Shandong single beam crane manufacturer summarizes several precautions for the operation of single beam crane, hoping to help you.

Single beam bridge crane is a kind of lifting equipment that is erected horizontally over workshops, warehouses and stockyards to lift materials. Because its two ends are located on tall concrete columns or metal supports, it looks like a bridge. The bridge of the single beam bridge crane runs longitudinally along the track laid on the viaduct on both sides, which can make full use of the space under the bridge to lift materials without being hindered by ground equipment. It is a kind of lifting machinery with a wide range of use and a large number. It is an important tool and equipment to realize the mechanization and automation of production process in modern industrial production and lifting transportation. Therefore, single beam bridge cranes are widely used in indoor and outdoor industrial and mining enterprises, steel and chemical industry, railway transportation, ports and wharves, logistics turnover and other departments and places.

1. Before the operation of the single beam crane, all kinds of lifting tools must be checked to ensure that the lifting tools are complete and in good condition. If the rigger has defects, he cannot carry out the work of the crane.

2. Similarly, in the single beam crane, check the condition of the rope to make sure that the rope is firm, not loose or broken. If an object with edges is bound, a protective object needs to be added between the object and the rope to avoid the rope breaking.

3. The single beam crane needs to pay attention to finding the middle position of the weight, and the phenomenon of oblique pulling is not allowed. For special lifting objects, the staff need to operate from the side.

4. Don't rush when lifting objects. You must wait a moment until the goods are stable before continuing. It is forbidden to put sundries or stand on heavy objects. During lifting, irrelevant personnel shall not pass under the object.

5. Work measures should be improved. For example, staff should wear hats, have personnel to give unified command, and all departments should coordinate their work. When objects are off the ground, they need to check wire ropes and other components. If not, stop the machine for inspection.

6. When using a single beam crane, the lifted objects shall not stay in the air for a long time.